Similar Articles
NEW FOR THURSDAY: Indian Sculpture’s Future In Ocean City Unclear
OCEAN CITY -- With restoration funding uncertain, the future of the la...READ MORENEW FOR THURSDAY: School Safety Plan Includes 13 Resource Officers; Positions Will Need Special County Funding
SNOW HILL -- A new Safety Action Plan for Worcester County’s pub...READ MORENEW FOR WEDNESDAY: Beer, Bean Can Assault Suspect In Hot Water Again
OCEAN CITY -- An Ocean City woman, arrested twice within a few hours t...READ MORENEW FOR WEDNESDAY: County Approves New ‘Flagship’ Liquor Store On Route 50; West OC To Close Immediately; Berlin Store Likely Later
SNOW HILL -- The county-run Department of Liquor Control (DLC) asked a...READ MORENEW FOR TUESDAY: Four Arrested In Worcester Now Headed To Federal Court
BERLIN - Four men arrested and charged initially with drug distributio...READ MORENEW FOR MONDAY: Komen Race For The Cure Eyes April Return To OC
OCEAN CITY -- The boards in Ocean City will once again be flooded with...READ MORECounty Prepared To Handle Disasters, Staff Assures
SNOW HILL -- Hurricane season does not begin until June, but the Worce...READ MORECity Okays Employee Pay Study
SALISBURY – The City of Salisbury will receive an outsider’...READ MORECouncil Tables Elected Officials’ Travel Policy Changes
SALISBURY – A discussion over elected officials’ travel ex...READ MOREO’Malley Makes Big Push For Wind Energy Legislation
ANNAPOLIS -- Governor Martin O’Malley this week made his first b...READ MORERoller Coaster Now Missing From Downtown Skyline
OCEAN CITY – Residents and visitors to the resort area have likely noticed a decided void in the downtown Ocean City skyline, as a majority of the Tidal Wave roller coaster at Trimper’s Rides was recently taken down for a planned major refurbishment.
Earlier this month, a huge crane appeared in the downtown area to begin dismantling the top 75 feet or so of the Tidal Wave, including the familiar V-shape tracks that jut prominently into the south Ocean City skyline. Six large sections of track and another large support piece were systematically taken apart and are stored in the Trimper’s lots where a planned, routine repair and rehabilitation job is now underway.
“We started planning for this about three years ago and we knew it was time to do it,” said Operations Manager Brooks Trimper this week. “Last year, we did a major overhaul of the ride’s computer system and this year it’s time to tackle the physical side of the repair job.”
The double-loop, boomerang roller coaster has been a fixture in the downtown area since 1985 and it is routinely upgraded and maintained. Trimper said this week the timing of the planned repair had nothing to do with an incident involving the roller coaster this summer during which three children were injured.
In August, the ride malfunctioned when a steel cable snapped, injuring three children. Essentially, the roller coaster’s computer system detected a malfunction and safety features kicked in and stopped the ride immediately. When that occurred, a cable snapped and injured children nearby.
“This is a scheduled project that has nothing to do with the incident from this past season,” he said. “We’ve been planning it for about three years and the work going on now has nothing to do with the accident.”
A huge crane removed the familiar top sections of the Tidal Wave under the direction of engineers from Vekoma Rides Manufacturing, one of the largest roller coaster manufacturers in the world, along with Trimper’s in-house engineers. When the work is completed, the six sections of track and the support will be transported for painting and dipping in an anti-corrosion formula that prevents rust in the salty sea air. Once the repairs have been completed and the sections have been painted and dipped, they will be brought back to the park and re-installed on the site with the help of the same massive crane that dismantled the sections.
“Depending on a variety of factors, most importantly the weather, we hope to reinstall the sections as soon as March 1,” said Trimper. “As long as it’s ready by May, we’ll be in good shape.”











There are no comments.